Featured Projects
Located at Kens Bore, the Go-Line and Truck Laydown Area required a robust lighting solution capable of operating in demanding mining conditions. Supporting MinRes operations, the area experiences constant vehicle movement and activity, making clear visibility essential for maintaining safety and productivity.
The Solution
Ledtec supplied the KFS2 1200W floodlights, designed specifically for mining and heavy industrial applications. Delivering powerful, uniform light output, the fittings provide consistent coverage across the area.
Built to perform in harsh environments, the KFS2 range offers durability, reliability, and long-term performance, helping minimise maintenance while ensuring dependable operation.
The Result
A high-performance lighting solution delivered at Kens Bore for Mineral Resources (MinRes), illuminating the Go-Line and Truck Laydown Area with KFS2 1200W floodlights. Engineered for harsh mining environments, the installation provides reliable, consistent illumination to support safe and efficient operations.





